Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

POLYMER COATING IN A WAREHOUSE IN THE MOSCOW REGION

WE HAVE SAVED FOR THE CLIENT 120 100
15%Economy
Antistatic polymer coating for a warehouse in the Moscow region

FLOOR ENGINEERING CONSTRUCTION Antistatic polymer coating for a warehouse in the Moscow region

Block 6, Severnaya Zvezda Distribution Center, Zaramenye village, Dmitrovsky District, Moscow Region
Characteristics and description
Company name
Eco Service LLC
The purpose of the floor and the room itself
Antistatic polymer coating for a warehouse in the Moscow region
Type of floor
polymer floors
Thickness of the polymer coating
2.5 mm
Room area
100 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

We were approached by a management company working at the Lemana PRO facility. They needed to repair two sections of the battery warehouse — the top layer of the anti-static floor was crumbling.

The customer named resistance to dust, moisture, abrasion; impact resistance; durability as important parameters for the final coating; he especially focused on maintaining the antistatic function and protection from alkalis from batteries that got onto the surface.

Having received all the information about the current state of the facility and having listened to the wishes and requirements of the client, our design department developed the optimal solution — an antistatic polymer floor 2-3 mm thick.

Terms of work
Number of days for all work: 5
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 800 600 ₽
Antistatic polymer coating for a warehouse in the Moscow region: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Eco Service LLC

how we implemented this floor design

FEATURES OF WORKS

When signing the contract, it was immediately agreed that we would only start work in a few weeks, because our polymer flooring specialist was on vacation at that time.

Upon returning, he immediately began work and completed everything in 5 days.

OUR RESULTS

Thanks to the completed repairs, the floor became functional again and, as a pleasant bonus, acquired an aesthetic appearance.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Laying of a copper tape grounding loop
2.jpg
Application of conductive primer
3.jpg
Finished layer of conductive primer
4.jpg
Application of antistatic self-leveling layer

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Eco Service LLC

SEE THE RESULT OF OUR WORK
result-eko-servis.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton