Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "LR-YUG"
how we implemented this floor design
FEATURES OF THE WORK
Despite the small area of the facility, it turned out to be difficult. Firstly, during the arrival of the brigade for preparatory work, it turned out that in one area the existing grounds did not allow to act according to the plan. The workers left and waited for the customer to carry out the dismantling on their own.
Secondly, here, in addition to the actual installation of a concrete floor with a hardener, we did: an outdoor ramp with preliminary dismantling; installation of trays and sand traps indoors and, as a result, a floor with slopes.
Thirdly, two types of topping were used at the grout stage – ordinary gray for most of the area and colored for two rooms.
OUR RESULTS
If we compare the floor in the car service before work and now, then the difference is huge. Moreover, it is already visible how he shows himself in business, since the object is being exploited with might and main. We hope that over time the customer will appreciate the product of our work.