WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
The owner of the service station applied for the installation of a concrete floor and additional work on the installation of an outdoor ramp and the installation of trays inside.
After making a detailed technical assessment of the facility, our production department, headed by the chief designer, determined such a technical solution – a concrete floor with topping, reinforced with plastic macrofibre and installed water intake trays; an external ramp made of concrete with combined reinforcement.