Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR WITH A HARDENER FOR A REPAIR BOX IN THE MOSCOW REGION

WE HAVE SAVED FOR THE CLIENT 395 200
20%Economy
Concrete floor with a hardener for a repair box in Malakhovka

FLOOR ENGINEERING CONSTRUCTION Concrete floor with a hardener for a repair box in Malakhovka

MO, Lyubertsy, Malakhovka work settlement, Yegoryevskoe highway, 2
Characteristics and description
Company name
LLC "TechStroyCorporation"
The purpose of the floor and the room itself
Concrete floor with a hardener for a repair box in Malakhovka
Type of floor
topping floors
Thickness of the concrete layer
12 cm
Room area
385.75 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

The client had previously ordered a floor fill for his repair box from another company, and he was not satisfied with the result of the work. Therefore, he turned to us to fill the second half of the room.

In addition to the installation of the floor inside, it was also necessary to make a ramp on the street. The technical solution was chosen as follows: a concrete floor of an average thickness of 12 cm with a reinforcing top layer, reinforced with a single layer of reinforcement and polypropylene macrofibre.

Terms of work
Number of days for all work: 6
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 1 976 100 ₽
Concrete floor with a hardener for a repair box in Malakhovka: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "TechStroyCorporation"

how we implemented this floor design

FEATURES OF THE WORK

Before the main work on the installation of the concrete floor and ramp, the existing foundation next to the gate was dismantled.

The floor was tilted in the room to connect the different height levels of the surface at the gate and at the opposite wall.

Since the facility is a facility for the repair of heavy machinery, metal strips were installed on the ramp to protect the concrete pavement.

OUR RESULTS

It is important for our company that the customer receives a good product and is satisfied. That's exactly what happened at this facility. Our foreman said that the customer, being a serious person, even smiled at the result when signing the act of completed work.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Preparation of the foundation
2.jpg
Preparatory work continues
3.jpg
The filling has started
4.jpg
The filling continues
5.jpg
The filling has been completed, including the ramp
6.jpg
Finished grout
7.jpg
Shrinkage seams are cut
8.jpg
Sealed seams

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY LLC "TechStroyCorporation"

SEE THE RESULT OF OUR WORK
result-tekhstrojkorporaciya-malahovka.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton