Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR WITH A HARDENER FOR A WAREHOUSE IN THE LYUBLINSKY DISTRICT OF MOSCOW

WE HAVE SAVED FOR THE CLIENT 420 000
20%Economy
Concrete floor with a hardener for a warehouse in the Lyublinsky district of Moscow

FLOOR ENGINEERING CONSTRUCTION Concrete floor with a hardener for a warehouse in the Lyublinsky district of Moscow

51B Verkhniye Polye Street, Moscow
Characteristics and description
Company name
Individual entrepreneur
The purpose of the floor and the room itself
Concrete floor with a hardener for a warehouse in the Lyublinsky district of Moscow
Type of floor
topping floors
Thickness of the concrete layer
12 cm
Room area
569 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

Floors urgently needed to be made at a warehouse in the south-east of Moscow – the previous contractor, with whom the customer collaborated, could not go to work this time. An active search led him to us.

A detailed technical survey of the client showed that using plastic fiber as a reinforcing element at the facility would be sufficient – the indoor base was a concrete slab. But the customer insisted on having a reinforcing mesh.

Through communication, a compromise was reached. The following design was approved: a concrete floor with a hardening top layer, an average thickness of 120 mm, with combined reinforcement of plastic fiber and metal mesh.

Terms of work
Number of days for all work: 26
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 2 100 000 ₽
Concrete floor with a hardener for a warehouse in the Lyublinsky district of Moscow: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Individual entrepreneur

how we implemented this floor design

FEATURES OF THE WORK

Even before the contract was signed, our specialist visited the site and carried out elevation differences, during which he marked floor levels on the walls and columns. But there was a nuance – almost at the same time there was a painting going on. In order to avoid double work – re-survey - we have agreed in advance with the customer that our marks remain intact.

As always, we carefully selected among the nearby concrete plants the one that met our requirements. The difficulty was that most batching plants didn't have gravel – only dolomite and granite were available.

We rejected dolomite immediately: firstly, it is less durable; secondly, there was no experience working with this type of crushed stone – it was unknown how it would behave under temperature loads.

Therefore, although the client's allocated budget for materials assumed the use of cheaper gravel crushed stone, we, somewhat to our detriment, chose granite. But this decision gave us confidence in the result.

The freshly painted walls and columns were protected with film during the preparation stage to prevent dirt from getting in during the rest of the work.

OUR RESULTS

You can rest assured – now at least one warehouse in the Lublin district is equipped with a modern and durable concrete floor.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Adopted metal
2.jpg
Dismantling the ramp
3.jpg
Checking the length of the lap joint
4.jpg
The walls have been protected by a film
5.jpg
An insulating seam is ready along the walls
6.jpg
The concrete pump track has been installed
7.jpg
Concrete samples have been taken for laboratory testing
8.jpg
The pouring is in full swing
9.jpg
The pouring has been completed
10.jpg
Filling with a strengthening composition (topping)
11.jpg
Treatment with grinding machines
12.jpg
A moisture-retaining impregnation has been applied
13.jpg
Checking the flatness of the floor
14.jpg
The shrinkage seams have been cut
15.jpg
Checking the depth of the seams
16.jpg
Cleaning of the territory

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Individual entrepreneur

SEE THE RESULT OF OUR WORK
result-ip-pentyuhov-moskva-verhnie-polya.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton