Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR IN THE PRODUCTION BUILDING OF BALASHIKHA

WE HAVE SAVED FOR THE CLIENT 80 000
20%Economy
Concrete floor with a hardener for the production building of LLC "SU-17", Balashikha

FLOOR ENGINEERING CONSTRUCTION Concrete floor with a hardener for the production building of LLC "SU-17", Balashikha

MO, Balashikha, Highway Enthusiasts, 5
Characteristics and description
Company name
SU-17 LLC
The purpose of the floor and the room itself
Concrete floor with a hardener for the production building of LLC "SU-17", Balashikha
Type of floor
topping floors
Thickness of the concrete layer
170 cm
Room area
256 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

FOUND OUT THE NEEDS OF THE CLIENT

The general contractor acted as the customer. The task for this facility is to fill the concrete floor on the production building with a ready–made, connected reinforcement frame. I.e., the general contractor prepared the base and performed reinforcement on his own, and also supplied concrete and a concrete pump himself.

 The following aspects are important to the customer:

Terms of work
Number of days for all work: 30
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 20
Total cost
Budget within the framework of: 399 000 ₽
Concrete floor with a hardener for the production building of LLC "SU-17", Balashikha: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: SU-17 LLC

how we implemented this floor design

DIFFICULTIES DURING WORK

The concrete supplied by the customer turned out to be with additives, which increased its hardening time. For topping, such a factor is unfavorable. Our workers have done their best to minimize the consequences of such concrete. The second difficulty is that the concrete pump broke twice during the installation of the floor. The third difficulty is that a foundation for equipment was previously installed on this site, which made some areas of the floor difficult to access both for pouring and for subsequent processing of topping machines.

THE RESULTS OF OUR WORK

Due to several difficulties that arose during different stages of the coating device, we completed the work 10 hours later. Nevertheless, the customer was satisfied with the result and said that, if necessary, he would give a positive recommendation. For us, this production building is the third completed facility in Balashikha.

The stages of the floor arrangement and the result of the work are shown in the photo below.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The fittings are fixed on the fixators-"chairs"
2.jpg
Unloading components for the highway
3.jpg
A concrete supply route has been installed
4.jpg
We accept and level the concrete mixture
5.jpg
Rubbed the surface with grout machines
6.jpg
Varnished the floor

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY SU-17 LLC

SEE THE RESULT OF OUR WORK
result-su-17.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton