WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
The administrative director of the Ralf Ringer company approached us with the task of installing an industrial floor in a store in Moscow, near the Bulvar Rokossovskogo metro station.
After a preliminary technical assessment and on-site visit, we collected the necessary data and developed an optimal solution.
The design selected was a topping floor with an average thickness of 11 cm, reinforced with plastic fibre and additional frame reinforcement in areas with a weak base.