Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR WITH A HARDENER FOR TWO WAREHOUSES IN THE MOSCOW REGION

WE HAVE SAVED FOR THE CLIENT 391 100
20%Economy
Concrete floor with a hardener for two warehouses in the Moscow region

FLOOR ENGINEERING CONSTRUCTION Concrete floor with a hardener for two warehouses in the Moscow region

Moscow region, Pervomayskoye settlement, Gubtsevo village, Dorozhnaya Street, house 20, building 1
Characteristics and description
Company name
NORKPALM Company LLC
The purpose of the floor and the room itself
Concrete floor with a hardener for two warehouses in the Moscow region
Type of floor
topping floors
Thickness of the concrete layer
15 cm
Room area
558 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

We were approached by our already regular client, for whom we had made a topping floor in a warehouse of 8,500 m2 in 2023 and a polymer floor in a production facility in 2024. This time, work was required for two separate warehouse facilities.

The technical solution for each warehouse was chosen differently: for a small room – a concrete floor with an average thickness of 150 mm with a hardening top layer and reinforced with steel fiber; for a large room – a concrete floor with an average thickness of 90 mm with a hardening top layer and reinforced with plastic fiber.

Terms of work
Number of days for all work: 7
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 1 955 500 ₽
Concrete floor with a hardener for two warehouses in the Moscow region: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: NORKPALM Company LLC

how we implemented this floor design

FEATURES OF THE WORK

The previous two times of cooperation with us turned out to be successful for the customer, and therefore this production cycle caused him any worries.

Since there were no openings for the concrete pump route in the small room, the customer cut a hole in the sandwich panel.

We completed two stages of work in one day: preparation before lunch, and filling after lunch.

OUR RESULTS

If the client has contacted us for the third time, it means that we are definitely doing something right in our business. We are ready to continue to implement our competence within the framework of new facilities.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Equipment and materials at the site
2.jpg
The film has been laid; the joints have been taped
3.jpg
The customer has cut a hole in the sandwich panel for the concrete pump track
4.jpg
The plumbing pipe and columns have been covered with a damping tape
5.jpg
The concrete pump has arrived at the facility
6.jpg
The concrete pump track has been assembled
7.jpg
Filling fiber into concrete
8.jpg
Pouring small room
9.jpg
Pouring large room with self-draining
10.jpg
The grout has been completed and the seams have been cut
11.jpg
Checking seam depth
12.jpg
Checking deviation from finished floor plane

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY NORKPALM Company LLC

SEE THE RESULT OF OUR WORK
result-norkpalm-gubtsevo-2025.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton