Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: SM TECHNICS LLC
how we implemented this floor design
FEATURES OF THE WORK
According to the contract, we had to dismantle a small section of the floor in front of the gate inside the building in order to make a ramp in this place later. But it so happened that we also removed some of the concrete from the outside of the opening. We had to make a ramp in the originally planned location, and restore the area on the street.
In our opinion, it turned out even better on the street than it was: firstly, we made the new ramp thicker; secondly, we framed it with a metal corner, which was not the case before.
Apart from the large entrance gate, there were no more openings in the room, not even doors. At first, the situation looked like we would be able to fill the entire room in two separate stages. But there was a solution to do this job right away.
In the area of the far wall there was a ladder leading to the mezzanine. The team of grouters went there before the pouring and stayed there until the concrete had hardened sufficiently. And at the right moment they came down and started grouting.
OUR RESULTS
Good work has been done at the facility, resulting in a modern industrial floor with a ramp that meets the expected loads and other requirements.