Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR WITH A HARDENER FOR THE WORKSHOP IN THE WORK SETTLEMENT OF LOTOSHINO

WE HAVE SAVED FOR THE CLIENT 103 800

FLOOR ENGINEERING CONSTRUCTION Concrete floor with a hardening top layer for a workshop in the Moscow region

MO, Lotoshino city, Lotoshino work settlement, Sushzavodskaya str., 12
Characteristics and description
Company name
LLC "Korabel Production Company"
The purpose of the floor and the room itself
Concrete floor with a hardening top layer for a workshop in the Moscow region
Type of floor
topping floors
Thickness of the concrete layer
10 cm
Room area
104 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

The client rented a small production facility on the territory of the plant. The first thing he and his team decided to do there was the floor. Therefore, he turned to us for such a service.

Since the workshop already had a concrete base, our chief designer selected the appropriate optimal technical solution – a concrete floor with topping and reinforcement with polypropylene macrofibre.

Terms of work
Number of days for all work: 5
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 519 300 ₽
Concrete floor with a hardening top layer for a workshop in the Moscow region: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "Korabel Production Company"

how we implemented this floor design

FEATURES OF THE WORK

The location of the object turned out to be not the closest, but this did not affect the speed of work in any way. Moreover, we completed the preparation and filling stages in one day, although they usually take two.

There were some difficulties with ventilation of the room, which is why the customer's representatives asked not to smoke with grout machines. The situation was solved very simply – all the work was done on weekends so that it was possible to open the doors and ventilate.

OUR RESULTS

Now the rented workshop has a new industrial floor that fully meets the production requirements of the client's company. Well, another locality has appeared in our portfolio – the working village of Lotoshino.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Preparatory work
2.jpg
Assembling the concrete pump track
3.jpg
Foaming corners
4.jpg
Filling is in progress
5.jpg
The filling continues
6.jpg
Finishing the filling
7.jpg
Completed the grout
8.jpg
Applied the varnish
9.jpg
Cutting of shrinkage seams
10.jpg
The seams are cut
11.jpg
Cleaning after cutting seams
12.jpg
The seams were sealed

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY LLC "Korabel Production Company"

SEE THE RESULT OF OUR WORK
result-korabel-lotoshino.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton