WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
The customer contacted us in early August. The building was still under construction, the frames were raised, but there were no walls and roof. At that time, a preliminary calculation was made, but when the building was already prepared (walls, roof appeared), we were invited to perform the work themselves.
When we decided on the design of the floor, the choice was between polished concrete and concrete with topping. As a result, it was considered that the optimal solution here would be a concrete floor with topping reinforced with macrofibre, and proposed it. As a result, this technical solution was implemented.
The loads in the warehouse were expected to be standard – no more than 4-5 tons.
The following aspects are important to the customer: