INDUSTRIAL FLOOR AT THE WAREHOUSE OF GlavPromStroy LLC IN SHCHELKOVO

WE HAVE SAVED FOR THE CLIENT 274 600
20%Economy
Concrete floor with a reinforcing top layer for a warehouse in Shchelkovo

FLOOR ENGINEERING CONSTRUCTION Concrete floor with a reinforcing top layer for a warehouse in Shchelkovo

MO, Shchelkovo, Zavodskaya str., 2
Characteristics and description
Company name
GlavPromStroy LLC
The purpose of the floor and the room itself
Concrete floor with a reinforcing top layer for a warehouse in Shchelkovo
Type of floor
topping floors
Thickness of the concrete layer
70 cm
Room area
1380 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

The customer contacted us in early August. The building was still under construction, the frames were raised, but there were no walls and roof. At that time, a preliminary calculation was made, but when the building was already prepared (walls, roof appeared), we were invited to perform the work themselves.

When we decided on the design of the floor, the choice was between polished concrete and concrete with topping. As a result, it was considered that the optimal solution here would be a concrete floor with topping reinforced with macrofibre, and proposed it. As a result, this technical solution was implemented.

The loads in the warehouse were expected to be standard – no more than 4-5 tons.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 20
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 1 373 300 ₽
Concrete floor with a reinforcing top layer for a warehouse in Shchelkovo: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: GlavPromStroy LLC

how we implemented this floor design

FEATURES OF THE WORKS

Since the building is brand new, the customer has not yet made a concrete blind area around the perimeter. There was no drainage system, and therefore water after snowmelt accumulated near the building, and from under the foundation it went inside the room. It started at the moment when we completed the pouring stage and started grout. As a result, due to the moisture that penetrated into the room, the concrete took longer to harden, and the workers had to rub over more and generally work harder.

Even during the filling, when some area was already flooded, an accident happened in this area and the lights were turned off. The concrete unit was also unable to supply us with concrete. I had to take an unplanned break. Fortunately, this pause turned out to be acceptable in duration for the implemented technical solution. Electricity was restored fairly quickly, and work continued.

OUR RESULTS

The customer was satisfied with the result. He plans to raise a new building in a couple of months and invite us to fill again. So we are waiting for continued cooperation.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The room is fully ready for work
2.jpg
Some of the materials were delivered
3.jpg
More materials have been delivered
4.jpg
Preparatory work
5.jpg
The filling stage begins
6.jpg
We accept a concrete mixture
7.jpg
Ensuring the cleanliness of the walls manually
8.jpg
Working with a vibrating rack
9.jpg
Grout stage
10.jpg
Completed the grout
11.jpg
A moisture-retaining impregnation was applied
12.jpg
Cutting seams

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY GlavPromStroy LLC

SEE THE RESULT OF OUR WORK
result-ip-zverev.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton