Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR WITH TOPPING IN THE PRODUCTION SHOP IN KOLOMNA

WE HAVE SAVED FOR THE CLIENT 1 329 400

FLOOR ENGINEERING CONSTRUCTION Concrete floor with a reinforcing top layer for the Kolomna workshop

MO, Kolomna, Ozerskiy proezd, 9
Characteristics and description
Company name
Kolomna Experimental Meat Processing Plant JSC
The purpose of the floor and the room itself
Concrete floor with a reinforcing top layer for the Kolomna workshop
Type of floor
topping floors
Thickness of the concrete layer
18 cm
Room area
2016 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

We were contacted by a regular customer, for whom we have made floors in several buildings and premises over the previous years. In this case, it was necessary to make a floor for the production workshop of an almost square shape with pillars with an area of 2,016 m2.

As a technical solution, a concrete floor with a reinforcing top layer was chosen, reinforced with polypropylene fiber over the entire area, and in places with a sandy base additionally reinforced with a road grid.

Terms of work
Number of days for all work: 15
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 6 647 000 ₽
Concrete floor with a reinforcing top layer for the Kolomna workshop: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Kolomna Experimental Meat Processing Plant JSC

how we implemented this floor design

FEATURES OF THE WORK

On the left and right sides of this room, the floors have already been filled in by us in the past. The customer had a wish that the new floor would be level with them. Since sand was scattered everywhere on the concrete base, we did this – in some places the sand layer was removed to the desired level, and in some, on the contrary, it was poured.

In parallel with our production process, a new tenant was working at the facility (digging a trench, which we had to reinforce on the move) and the customer. We had to take these factors into account, coordinate each stage with them and sometimes shift our work.

OUR RESULTS

At the end of the work, the customer checked the entire area and said that he liked everything. He also noted that we are professionals and know our business. Such words arouse pride and a desire to continue our work, which we will dedicate 2024 to.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Workers on site; loader on site
2.jpg
The Bobcat mini loader is working
3.jpg
The work with sand continues
4.jpg
Preparation of sand filling on an area of 70 m2
5.jpg
All materials have been delivered to the facility
6.jpg
The sandy base for the first filling is ready
7.jpg
In places with a sandy base, a grid was laid
8.jpg
The pump has arrived at the facility
9.jpg
They started pouring
10.jpg
The filling continues
11.jpg
We are compacting and leveling the concrete layer with a vibrating screen
12.jpg
Topping filling
13.jpg
The surface is being treated with concrete finishing machines
14.jpg
Grout was completed; varnish was applied
15.jpg
The seams were cut
16.jpg
The seams were sealed

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Kolomna Experimental Meat Processing Plant JSC

SEE THE RESULT OF OUR WORK
result-ao-kom-osen-2023.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton