WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
The customer contacted us for the installation of an industrial floor for a basement production facility near Kotelniki metro station. The expected loads were as follows: dynamic – carts with cargo, static – machines weighing from 300 kg to 2.5 tons.
The final selected structure turned out to have a very large margin of safety (as the client wanted): a concrete floor with a white topping with an average thickness of 150 mm, reinforced with a single layer of reinforcement frame and steel fiber.