WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
In the workshop in the city of Zhukovsky, the general contractor performed various works and turned to us for the installation of floors.
Based on the information received about the actual condition of the existing foundation and the planned loads, the following technical solution was determined – a concrete floor with topping, combined reinforcement from a frame with a rod diameter of 8 mm and plastic fiber.