WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
At the time of contacting our company, the customer had not yet set up a base at the facility. Accordingly, in addition to the main work on the implementation of the industrial floor, it was necessary to perform a rather long preliminary stage.
The technical solution was prepared by the chief designer as follows: full–fledged preparation of a sandy base; installation of a concrete floor with an average thickness of 18 cm with a hardener and reinforcement with a double layer of reinforcement, as well as the installation of an external ramp.