Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR WITH TOPPING FOR A WAREHOUSE BUILDING IN SHCHYOLKOVO

WE HAVE SAVED FOR THE CLIENT 666 000
20%Economy
Concrete floor with topping for a warehouse building in Shchelkovo

FLOOR ENGINEERING CONSTRUCTION Concrete floor with topping for a warehouse building in Shchelkovo

Moscow Region, Shchyolkovo Urban District, Shchyolkovo City, Shchyolkovo Industrial Park Area, Land Plot 43
Characteristics and description
Company name
VIVALDO RUS LLC
The purpose of the floor and the room itself
Concrete floor with topping for a warehouse building in Shchelkovo
Type of floor
topping floors
Thickness of the concrete layer
15 cm
Room area
840 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

Two years later, our client contacted us again, as there was a need to install floors for an adjacent warehouse in the same location.

Based on the purpose of the facility, expected loads, temperature conditions, and other factors, our design department selected the optimal solution — a 150 mm thick topping floor reinforced with steel fiber at a rate of 25 kg/m³.

Terms of work
Number of days for all work: 30
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 3 329 700 ₽
Concrete floor with topping for a warehouse building in Shchelkovo: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: VIVALDO RUS LLC

how we implemented this floor design

FEATURES OF THE WORKS

We signed the contract six months ago, but all this time other work was going on at the facility, so we had to wait for our time. In mid-July, the site was cleared — and the time had come.

Another contractor prepared the base, and we, in turn, checked the evenness and made adjustments. After our comments, he corrected several places. Stamp tests of the soil were also carried out.

After the main work was completed, the customer's representative inspected the floor and the entire premises. In the report, he noted a couple of minor defects — for example, concrete splashes on the wall. We took everything into account and immediately began to correct them.

OUR RESULTS

Now the warehouse has a modern and reliable industrial floor. It can be used for your own needs or rented out — with such a covering, tenants will definitely not keep you waiting.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Materials at the site
2.jpg
Plate load tests of the soil are being carried out
3.jpg
Installed the damping tape along the walls
4.jpg
Protected the walls with film
5.jpg
Unloading the power trowel equipment
6.jpg
Checking the concrete slump
7.jpg
Loading the fiber into the concrete mixer
8.jpg
The first mixer truck left the plant for the site
9.jpg
Pouring concrete with a dumper
10.jpg
Concrete compaction with a vibrating screed
11.jpg
Concrete pouring completed
12.jpg
Spreading the hardener on the concrete surface
13.jpg
Surface treatment with a grinding machine
14.jpg
Contraction joints cut

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY VIVALDO RUS LLC

SEE THE RESULT OF OUR WORK
result-vivaldo-sklad-2025-28042253.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton