WE HAVE DETERMINED THE OPTIMAL ENGINEERING SOLUTION
At his hangar, the customer wanted to get a smooth, durable, beautiful floor with minimal overspending of concrete in the shortest possible time as a result of the work. After conducting a technical assessment, our chief engineer chose such a solution – a concrete topping floor with reinforcement mesh reinforcement. The filling was planned to be done in two stages – first one half, then the other.
The following aspects are important to the customer: