Characteristics and description
Company name
LLC "SNT"
The purpose of the floor and the room itself
Concrete floor with topping for a warehouse in the Chertanovo Central area
Type of floor
topping floors
Thickness of the concrete layer
80 cm
Room area
245 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

The customer built a building from sandwich panels of a small area. And, as we understood during the negotiations, he did not know about the topping floor technology earlier. By that time, the foundation concrete slab had already been filled in and even ramps were made that rose to its height.

Initially, the customer planned to cover this self-filled plate with polymer. But such an option would be too expensive and too inefficient – the surface of the slab was not rubbed and was not smooth. 

We proposed and subsequently implemented our standard technical solution – a concrete floor with topping reinforced with polypropylene macrofibre.

Terms of work
Number of days for all work: 7
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 749 300 ₽
Concrete floor with topping for a warehouse in the Chertanovo Central area: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "SNT"

how we implemented this floor design

FEATURES OF THE WORKS

The task at such an object, where there are sandwich walls, is to protect them very much from concrete, since they are extremely difficult to clean. There may even be a need for painting. Therefore, the walls were well protected with a film so as not to splatter.

We first dismantled the existing ramp in length by one and a half meters and made a new one instead to the floor height that turned out after pouring the floor indoors.

OUR RESULTS 

The customer received at his disposal a solid, smooth concrete floor. Also, thanks to us, he now has an understanding that in the future, immediately at the stage of manufacturing the concrete slab itself, it is possible to do work with topping, thus saving both time and money.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The walls have been protected; the ramp is being dismantled under the ramp
2.jpg
We have laid a waterproofing film; we are laying a route
3.jpg
The mixer has arrived
4.jpg
The reception of concrete has begun
5.jpg
The filling is in full swing
6.jpg
Leveling the flooded layer on the ramp
7.jpg
Finished grout
8.jpg
Apply varnish
9.jpg
The cutting of seams is completed
10.jpg
Sealing of seams is performed

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY LLC "SNT"

SEE THE RESULT OF OUR WORK
result-sklad-snt-dorozhnaya.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton