Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR IN THE YARD OF A COTTAGE IN THE ISTRA DISTRICT

WE HAVE SAVED FOR THE CLIENT 108 000
20%Economy
Concrete floor with topping for cottage, MO, Istra district, KP Lesnaya Rhapsody

FLOOR ENGINEERING CONSTRUCTION Concrete floor with topping for cottage, MO, Istra district, KP Lesnaya Rhapsody

MO, Istra district, KP Lesnaya Rhapsody
Characteristics and description
Company name
Private person
The purpose of the floor and the room itself
Concrete floor with topping for cottage, MO, Istra district, KP Lesnaya Rhapsody
Type of floor
topping floors
Thickness of the concrete layer
90 cm
Room area
80 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

FOUND OUT THE NEEDS OF THE CLIENT

This time our object turned out to be in an elite residential village of the Moscow region. It was the courtyard of a fashionable cottage in the Art Nouveau style. The house itself is in black and brown tones, so the customer set the task – to make a concrete floor with black topping.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 60
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 20
Total cost
Budget within the framework of: 541 000 ₽
Concrete floor with topping for cottage, MO, Istra district, KP Lesnaya Rhapsody: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Private person

how we implemented this floor design

DIFFICULTIES DURING WORK

Due to the limited space, there were difficulties with the installation and layout of the concrete pump.
When feeding the concrete mixture, the car was standing on the roadway of the village and partially interfered with the movement of other vehicles. At this stage, our guys worked hard to clear the road as soon as possible.
The flat part of the yard was located under a canopy, but then there was a sharp exit to the road. Our specialists applied all their engineering savvy skills and clearly calculated the angle of inclination and other features of the descent, so that at the end of all stages, the congress in all places turned out to be beautiful and technically standard.
During the processing of concrete, the grout machines were noisy. Loud noises disturbed residents of nearby houses. Here, too, as in the case of concrete pumps, the workers acted especially quickly.

THE RESULTS OF OUR WORK

The work was completed on time. The client is satisfied – he received a solid black concrete floor in his courtyard, which matches the color scheme with the house itself.

The stages of the floor arrangement and the result of the work are shown in the photo below.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The concrete pump has arrived
2.jpg
We accept a concrete mixture
3.jpg
We accept a concrete mixture
4.jpg
Align the surface with the rule
5.jpg
We apply varnish on the sanded floor with topping
6.jpg
The varnish dries up

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Private person

SEE THE RESULT OF OUR WORK
result-lesnaya-rapsodiya.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton