Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

TOPPING FLOOR FOR PRODUCTION PREMISES IN MOSCOW

WE HAVE SAVED FOR THE CLIENT 224 000
20%Economy
Concrete floor with topping for production premises in Moscow

FLOOR ENGINEERING CONSTRUCTION Concrete floor with topping for production premises in Moscow

Moscow, Dubninskaya str., 75, p. 1
Characteristics and description
Company name
TriA Energo LLC
The purpose of the floor and the room itself
Concrete floor with topping for production premises in Moscow
Type of floor
topping floors
Thickness of the concrete layer
100 cm
Room area
420 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE DETERMINED THE OPTIMAL ENGINEERING SOLUTION

This time the object was a small heated production facility in the north of Moscow. The actual composition of the base in it is an old Soviet tile on a screed. For the customer, it was a rented room.

The following was required of us: the customer's company is engaged in the assembly of large electrical cabinets, and they needed a strong floor that would withstand all this. Also important properties of the final coating were called indelibility, evenness and gray color.

The engineering solution that we chose and subsequently successfully implemented is a concrete floor with a hardener using polymer macrofibre.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 30
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 5
Total cost
Budget within the framework of: 1 120 000 ₽
Concrete floor with topping for production premises in Moscow: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: TriA Energo LLC

how we implemented this floor design

DIFFICULTIES DURING WORK

There was a delay in the start of work due to the need to check the grounds. It was the desire of the owner of the building – he was worried that it was weak. This circumstance somewhat postponed the start of work. As for our work itself, everything was done quickly and professionally.

OUR RESULTS

In the shortest possible time, the client received a durable coating at his disposal, on which he will now be able to successfully carry out his production processes for more than one year and not worry about whether the floor will withstand the loads. It will hold!

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
2.jpg
3.jpg
4.jpg
5.jpg
6.jpg
7.jpg
8.jpg

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY TriA Energo LLC

SEE THE RESULT OF OUR WORK
result-tria-energo.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton