Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR WITH A HARDENER FOR VNUKOVO OUTLET VILLAGE FOOD COURT

WE HAVE SAVED FOR THE CLIENT 684 500

FLOOR ENGINEERING CONSTRUCTION Concrete floor with topping for Vnukovo Outlet Village food court

Moscow, Moskovsky settlement, Lapshinka village, 8D
Characteristics and description
Company name
Food and People LLC
The purpose of the floor and the room itself
Concrete floor with topping for Vnukovo Outlet Village food court
Type of floor
topping floors
Thickness of the concrete layer
10 cm
Room area
1366 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

The customer contacted us with the task of making a concrete floor for the food court and several technical rooms. We have selected the following technical solution – a concrete floor with topping thickness from 75 mm to 115 mm (average – 100 mm), reinforced with polypropylene macrofibre.

Terms of work
Number of days for all work: 38
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 3 422 800 ₽
Concrete floor with topping for Vnukovo Outlet Village food court: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Food and People LLC

how we implemented this floor design

FEATURES OF THE WORK

It was a difficult object from the point of view of the very implementation of the project. First of all, the small thickness of the concrete layer. In some places, it was 80 mm, which is the minimum allowed by standard technology. Moreover, there were areas where, due to the lack of other options, it was necessary to make the layer even smaller.

Further, a large number of abutments to various structures are walls, columns, ladders, and floor hatches. We have also committed ourselves to installing special floor hatches – more about them below.

These structures were intended for cleaning, for connecting communications. It was necessary to install a hatch, make a floor abutment to it, and also perform the lid with a concrete floor with a hardener so that everything could be easily opened and taken out later. We engaged a specialist who worked separately on this task.

At the entrances, the floor installation work had to be carried out taking into account the installation of a dirt-proof grate, which also created certain difficulties.

OUR RESULTS

As a result of all the work, the Vnukovo Outlet Village food court received a concrete floor, which added its originality and charm to the overall surroundings. From a technical point of view, we can even say that this is a decorative smooth topping.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Preparation for the first filling
2.jpg
The concrete pump is in place; the installation of the track has begun
3.jpg
Ladders and hatches are installed at the level of the clean floor
4.jpg
The first mixer is ready for unloading; we fill in the macrofibre
5.jpg
The premises are being filled in
6.jpg
We have completed the filling
7.jpg
Cutting seams on the first square
8.jpg
Preparation of the second area for filling
9.jpg
The filling of the second square is being completed
10.jpg
The mezzanine is ready for filling
11.jpg
The third area is ready for filling
12.jpg
Windows and batteries are protected
13.jpg
Filling the mezzanine
14.jpg
There is a filling on the ground floor
15.jpg
Grout stage
16.jpg
The seams are cut

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Food and People LLC

SEE THE RESULT OF OUR WORK
result-vnukovo-outlet.png

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton