WE HAVE CHOSEN THE OPTIMAL ENGINEERING SOLUTION
The customer turned to us with the task of making a concrete floor with a hardener in two rooms – a warehouse and a basement. In the first of them there was a curved floor slab. An engineering solution was required that, firstly, would allow it to be leveled; secondly, to make the coating not very thick, so as not to create excessive pressure. At the same time, an important property of the floor had to be strength to withstand future loads.
It was necessary to implement all of the above within the planned budget and as soon as possible, because the object was being prepared for lease. The optimal solution was found – topping concrete floor with macrofibre.