Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR WITH TOPPING IN A WAREHOUSE IN BALASHIKHA

WE HAVE SAVED FOR THE CLIENT 820 400
20%Economy
Concrete floor with topping in a warehouse in Balashikha

FLOOR ENGINEERING CONSTRUCTION Concrete floor with topping in a warehouse in Balashikha

MO, Balashikha, Belyakova str., 1b
Characteristics and description
Company name
Sabline Service LLC
The purpose of the floor and the room itself
Concrete floor with topping in a warehouse in Balashikha
Type of floor
topping floors
Thickness of the concrete layer
10 cm
Room area
1455.5 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

We were contacted by a company that manufactures pumps and pumping equipment. At their facility, it was necessary to make floors on the ground floor and on the mezzanine. For the customer, an important parameter for the final coating was resistance to moisture, dust, and abrasion.

Based on a thorough technical assessment, our chief designer selected a rational technical solution – a concrete floor with a reinforcing top layer reinforced with plastic fiber.

Terms of work
Number of days for all work: 5
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 4 102 000 ₽
Concrete floor with topping in a warehouse in Balashikha: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Sabline Service LLC

how we implemented this floor design

FEATURES OF THE WORK

Unlike the usual standard rectangular rooms, which are not limited by internal walls, this object on the ground floor consisted of several rooms, and this created some difficulties. As a result, we completed the filling in three stages – we made the first floor twice and then the second floor separately.

OUR RESULTS

The client received a modern topping floor that fully meets all production requirements.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Installation of a corner around the perimeter of the pit
2.jpg
We are preparing for pouring – we fill the fiber into the concrete mixture
3.jpg
The supply of concrete with mixed fiber has begun
4.jpg
Filling of two rooms on the first floo
5.jpg
Filling the rest of the rooms on the first floor
6.jpg
A day after grout, we make a marking for cutting seams
7.jpg
We are doing the filling on the second floor
8.jpg
The seams are cut
9.jpg
Cleaning the railing after work
10.jpg
Seams are sealed

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Sabline Service LLC

SEE THE RESULT OF OUR WORK
result-sablain-servis-balashikha.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton