WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
We were contacted by a general contractor who worked at the Gorky Film Studio. According to the project, it was required to carry out a complex of works on the installation of a concrete floor of different structures in several rooms of the film studio itself and in the adjacent room of the museum.
A concrete floor with a reinforcing top layer using two technologies was chosen as a technical solution – 1) "dry topping on fresh concrete" for the entire area of the film studio and 2) "wet topping on fresh concrete" for the museum area.