Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR WITH TOPPING FOR THE PREMISES OF THE GORKY FILM STUDIO

WE HAVE SAVED FOR THE CLIENT 1 224 900
20%Economy
Concrete floor with topping in the premises of the Gorky Film Studio

FLOOR ENGINEERING CONSTRUCTION Concrete floor with topping in the premises of the Gorky Film Studio

Moscow, Sergey Eisenstein str., 8
Characteristics and description
Company name
ATOMPROMSTROY LLC
The purpose of the floor and the room itself
Concrete floor with topping in the premises of the Gorky Film Studio
Type of floor
topping floors
Thickness of the concrete layer
12 cm
Room area
1790.8 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

We were contacted by a general contractor who worked at the Gorky Film Studio. According to the project, it was required to carry out a complex of works on the installation of a concrete floor of different structures in several rooms of the film studio itself and in the adjacent room of the museum.

A concrete floor with a reinforcing top layer using two technologies was chosen as a technical solution – 1) "dry topping on fresh concrete" for the entire area of the film studio and 2) "wet topping on fresh concrete" for the museum area.

Terms of work
Number of days for all work: 51
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 6 124 700 ₽
Concrete floor with topping in the premises of the Gorky Film Studio: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: ATOMPROMSTROY LLC

how we implemented this floor design

FEATURES OF THE WORK

The main difficulty during the entire production cycle was solving documentation issues. Usually, things are simple with us at this point: the contract was signed, all the work was completed and in the end the closing documents were signed.

Here it was different: since there were many different rooms and the work was carried out in several fills, it was necessary to separately document the completion of each stage. We are not used to this approach yet, but we have coped and gained experience for the future.

Also, during the production process, there were moments that were not taken into account in the original project. Therefore, they quickly agreed on additional agreements to the main agreement and acted on them.

OUR RESULTS

Thanks to our work, the film studio is now provided with reliable floors for many years to come. We are glad that we have had a hand in improving the cultural facility, which has produced more than a thousand films and television series. May this number grow further every day!

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Preparation of the foundation on the mezzanine
2.jpg
Filling on the mezzanine
3.jpg
Grout on the mezzanine
4.jpg
Rubbed and varnished
5.jpg
Filling in small studios
6.jpg
Rubbed and varnished in small studios
7.jpg
Seam cutting in small studios
8.jpg
Technical rooms on the second floor
9.jpg
Preparing ramps
10.jpg
The ramps were wiped and varnished
11.jpg
Installation of base plates and manhole covers
12.jpg
Preparation of the foundation in the field of the roadway
13.jpg
There is a filling in the corridor room
14.jpg
The grout was completed, the varnish was applied in the corridor room
15.jpg
Grout and varnish application have been completed in the museum premises
16.jpg
We are cutting the seams on the roadway of the film studio

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY ATOMPROMSTROY LLC

SEE THE RESULT OF OUR WORK
result-kinostudiya-imeni-gorkogo-atompromstroi.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton