Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

DREAM ISLAND MALL FLOOR FOR THE SNOW QUEEN'S CASTLE

WE HAVE SAVED FOR THE CLIENT 1 205 000
20%Economy
Fiber-concrete screed with 2 polymer layers coating in the Island of Dreams mall

FLOOR ENGINEERING CONSTRUCTION Fiber-concrete screed with 2 polymer layers coating in the Island of Dreams mall

Moscow, Nagatinsky Zaton district
Characteristics and description
Company name
ELEMENT Development LLC
The purpose of the floor and the room itself
Fiber-concrete screed with 2 polymer layers coating in the Island of Dreams mall
Type of floor
polymer floors
Thickness of the polymer coating
70 mm
Room area
1000 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

IDENTIFIED THE MAIN NEEDS OF THE CLIENT

For the Snow Queen Castle on the territory of the Dream Island Park, the customer formulated the need as follows – to perform a highly aesthetic seamless polymer coating capable of withstanding intense loads from pedestrians and designed for a long period of operation.

In more detail, the task sounded like this: to perform a fiber-concrete screed on the first and second floors in rooms of complex geometric shape. As a coating, perform a multilayer polymer structure, which includes a decorative film with a color pattern, filled with a high-strength transparent epoxy compound with colored sequins and decorative flocks and coated with a high-strength matte varnish.

The following aspects were important to the customer:

Terms of work
Number of days for all work: 30
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 6 000 000 ₽
Fiber-concrete screed with 2 polymer layers coating in the Island of Dreams mall: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: ELEMENT Development LLC

how we implemented this floor design

DIFFICULTIES IN THE INSTALLATION OF THE FLOOR AT THIS FACILITY

There were several difficulties during the installation of floors for this territory of the "Island of Dreams": installation work carried out by other contractors in parallel with us; the difficulty of supplying concrete mix to the object (the castle was far from the installation site of the concrete pump); low temperatures and high humidity; complex configuration of the premises; transfer of the work front in separate sections; power outages; high dust content in the air. Our company was able to cope with every obstacle in the work and get an excellent result.

RESULTS OF WORK

Each stage of the work was done on time with a high level of quality. The Snow Queen can rest easy – her castle now has beautiful floors for many years to come.

As a result, a concrete floor was obtained in accordance with the chosen design project. The work was completed on time. Russian President Vladimir Vladimirovich Putin himself came to the opening of the world's largest indoor theme park "Dream Island".

Stages of implementation engineering design of the floor

engineering design of the floor
Подача бетонной смеси автобетононасосом
Concrete mix supply by concrete pump
2.jpg
Installation of a concrete base on the terrace
3.jpg
Leveling the concrete mix on the terrace
4.jpg
We align the steps of the stairs with a polymer repair compound
5.jpg
Leveling of stairs with polymer repair compound
6.jpg
The device of the base polymer layer on the stairs
7.jpg
A base polymer layer is applied on the stairs
8.jpg
Applied a base polymer layer in the restaurant inside the castle
9.jpg
Color film sticker in the restaurant inside the castle
10.jpg
The surface is coated with sequins and floki in the restaurant
11.jpg
We apply a finishing transparent layer inside the lock
12.jpg
Finished floor in the castle restaurant

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY ELEMENT Development LLC

SEE THE RESULT OF OUR WORK
result-snezhnaya-koroleva.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton