Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

FIBRO CONCRETE FLOOR WITH TOPPING FOR A WAREHOUSE NEAR THE CITY OF VIDNOYE

WE HAVE SAVED FOR THE CLIENT 1 419 100
20%Economy
Fibro concrete floor with topping for a warehouse in the Moscow region

FLOOR ENGINEERING CONSTRUCTION Fibro concrete floor with topping for a warehouse in the Moscow region

Moscow region, Leninsky district, Ostrov village, Verkhnyaya Sloboda str., 1, p. 4
Characteristics and description
Company name
Joker LLC
The purpose of the floor and the room itself
Fibro concrete floor with topping for a warehouse in the Moscow region
Type of floor
topping floors
Thickness of the concrete layer
15 cm
Room area
1717.8 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

This warehouse is located in the Moscow region near the cities of Vidnoye and Dzerzhinsky. It was necessary to carry out work on the installation of an industrial floor in three stages.

The technical solution was chosen as follows – a concrete floor with topping with an average thickness of 140-150 mm, reinforced with steel fiber.

Terms of work
Number of days for all work: 12
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 7 095 600 ₽
Fibro concrete floor with topping for a warehouse in the Moscow region: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Joker LLC

how we implemented this floor design

FEATURES OF THE WORK

It was not so easy to take pictures of the differences before drawing up the contract due to the workload of the facility - shelves with goods, as well as a lot of goods between the shelves. But they found a way out and eventually made the necessary measurements.

After the liberation of the square, several destroyed sections of the current concrete foundation were found. They were additionally reinforced with a reinforcing mesh in one layer, having previously signed an additional agreement.

The work was carried out in three separate stages. This was agreed in advance with the customer, since he could not immediately vacate the entire warehouse involved in the production process.

We performed the first two fills on the existing concrete base, but with the third one it turned out differently: the base level was much lower than in the first two sections. Therefore, before pouring, 100 m3 of sand was brought, filled in, leveled and compacted.

OUR RESULTS

The client did the right thing by deciding to invest in his production premises, and now the warehouse in the village of Ostrov has a modern, durable and durable industrial floor.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
We are delivering steel fiber to the concrete plant
2.jpg
We've brought the equipment to the facility
3.jpg
We are cutting the damping tape for the insulating seam
4.jpg
Additionally, we are reinforcing some sections with a grid
5.jpg
Filling is in progress
6.jpg
The grout is finished; a moisture-retaining impregnation has been applied
7.jpg
Cut the seams
8.jpg
The second stage of work: preparing the floor for pouring
9.jpg
Crushed stone was brought to the concrete node especially for us
10.jpg
Filling
11.jpg
Finished the grout
12.jpg
Measuring the depth of the seams at the cutting stage
13.jpg
Cutting seams
14.jpg
The third stage of filling
15.jpg
Concrete treatment with topping "helicopters" with discs
16.jpg
The seams are cut

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Joker LLC

SEE THE RESULT OF OUR WORK
result-joker-ip-denisenkov-mo-ostrov.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton