Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

INDUSTRIAL FLOOR FOR HANGAR IN NARO-FOMINSK

WE HAVE SAVED FOR THE CLIENT 132 678
15%Economy
Floor for hangar, Naro-Fominsk

FLOOR ENGINEERING CONSTRUCTION Floor for hangar, Naro-Fominsk

MO, Naro-Fominsk, Avtodorozhnaya str., 2
Characteristics and description
Company name
Private person
The purpose of the floor and the room itself
Floor for hangar, Naro-Fominsk
Type of floor
topping floors
Thickness of the concrete layer
150 cm
Room area
1374.6 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

IDENTIFIED THE MAIN NEEDS OF THE CLIENT

An individual entrepreneur approached us with the task to equip a concrete floor with a reinforcing top layer in Naro-Fominsk. The object was a hangar with an area of 1374.6 m2 on the territory of the Pokonar plant. By the time the customer contacted our company, he had already installed double reinforcement and equipped a vapor barrier on his own. Provision of concrete and concrete pump was also undertaken by the client. We were required to purchase topping, curing, sealer, sealant from materials; of the works, it was necessary to perform the following steps: the device of abutments to the walls, laying, leveling and compacting the concrete mixture, applying and grouting the reinforcing composition of concrete with special equipment, applying moisture-retaining impregnation, cutting and sealing joints.

The following aspects were important to the customer:

Terms of work
Number of days for all work: 30
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 885 000 ₽
Floor for hangar, Naro-Fominsk: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Private person

how we implemented this floor design

DIFFICULTIES IN THE INSTALLATION OF THE FLOOR AT THIS FACILITY

Since this industrial room is unheated, and the work was carried out in winter at subzero temperatures, a proper microclimate was maintained through the use of 4 cannons placed in the corners.

THE RESULTS OF OUR WORK

The client was so impressed with the result of the work that he paid the balance of the funds under the contract even before the closing documents were signed.

See below the photos of the stages of our work.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The object is at the beginning of work
2.jpg
Preparation of the concrete pump for the supply of concrete mix
3.jpg
Acceptance of concrete mix
4.jpg
We level the concrete mixture
5.jpg
Leveling of concrete mix
6.jpg
Grouting of a concrete layer by a two-rotor machine
7.jpg
Completed the grout process
8.jpg
Cutting of shrinkage seams
9.jpg
Cutting of shrinkage seams
10.jpg
Sliced shrink seam

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Private person

SEE THE RESULT OF OUR WORK
result-lesyuk.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton