WHAT TECHNOLOGY WAS CHOSEN
The customer turned to us with a ready-made work plan and the necessary floor structure: it was necessary to strengthen the concrete floor slab with a thickness of 80 mm; to implement a dust-free topping coating; to separate the floor slab from the walls and frame it with a metal corner around the perimeter; to carry out work in stages with the movement of equipment. We just had to get down to business and faithfully complete the task.
The following aspects are important to the customer: