Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

INDUSTRIAL FLOOR FOR KOMUS WAREHOUSE IN KOLOMNA

WE HAVE SAVED FOR THE CLIENT 534 000
20%Economy
Floor for Komus warehouse, Kolomna

FLOOR ENGINEERING CONSTRUCTION Floor for Komus warehouse, Kolomna

MO, Kolomna, Oksky ave., 40
Characteristics and description
Company name
LLC "Himpol"
The purpose of the floor and the room itself
Floor for Komus warehouse, Kolomna
Type of floor
topping floors
Thickness of the concrete layer
220 cm
Room area
650 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

IDENTIFIED THE MAIN NEEDS OF THE CLIENT

This is the second facility where our company makes floors for the Komus company. The main requirement for the work on the part of the client was the shortest possible time for the completion of all stages – not to postpone until spring, but to do the entire production cycle at once.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 15
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 2 670 000 ₽
Floor for Komus warehouse, Kolomna: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "Himpol"

how we implemented this floor design

WHAT DIFFICULTIES HAVE WE ENCOUNTERED

The work was carried out in extremely difficult conditions, not intended for the installation of a concrete floor with topping, in winter. The warehouse room had many cracks that contributed to a strong draft. It was not possible to simply warm it up with the help of heat guns. It was economically impractical to erect a greenhouse, it was more profitable to move the work to a more favorable period. But the client really wanted to complete the work on the arrangement of a new warehouse.

We considered many options for the implementation of the project and as a result approached the solution of the problem comprehensively: we chose the most favorable period from the point of view of the weather; the concrete was served warm – for this, dry mixes for mixing concrete were heated by a heat gun, and the water in which the mixture was mixed was heated by a stove. Heat guns with a total capacity of 180 kW were installed in the room, which blew warm air under a shelter made of polyethylene film installed at a low height from the floor.

See below the stages of work at this facility.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
We begin laying the reinforcement mesh
2.jpg
The reinforcing mesh is laid
3.jpg
We prepare the concrete plant
4.jpg
The device of the insulating seam
5.jpg
The device of the insulating seam has been completed
6.jpg
Installation of the deformation seam
7.jpg
Preparation of concrete mix for feeding
8.jpg
We accept a concrete mixture
9.jpg
Acceptance of concrete mix
10.jpg
50% of the concrete mix has been accepted and filled in
11.jpg
Fill the remaining area with concrete
12.jpg
The whole area is completely flooded
13.jpg
Surface treatment with a two-rotor grout machine on discs
14.jpg
We use heat guns to maintain the temperature
15.jpg
Leveling the concrete layer
16.jpg
We apply a layer of topping
17.jpg
Grout topping
17.jpg
Grout of the hardener is completed

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY LLC "Himpol"

SEE THE RESULT OF OUR WORK
result-komus2.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton