On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR FOR A STORE IN THE SOLNTSEVO AREA

WE HAVE SAVED FOR THE CLIENT 51 300
11%Economy
Floor for the flower shop LLC "Paradox group", Moscow

FLOOR ENGINEERING CONSTRUCTION Floor for the flower shop LLC "Paradox group", Moscow

Moscow, Borovskoe sh., 6, k. 3
Characteristics and description
Company name
Paradox Group LLC
The purpose of the floor and the room itself
Floor for the flower shop LLC "Paradox group", Moscow
Type of floor
topping floors
Thickness of the concrete layer
100 cm
Room area
106 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

DESCRIPTION OF THE OBJECT AND THE CLIENT'S NEEDS

The object was planned for a retail space with a total area of 106 m2. The timing was very important to the client, the task was to fill the entire area in one shift. Small loads were planned for the floor: people would walk on the coating, and in some places there would be furniture and shelves for flowers. The customer also noted that the floor should be flat, have a color like in car parks and a warranty of at least two years.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 1
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 20
Total cost
Budget within the framework of: 450 000 ₽
Floor for the flower shop LLC "Paradox group", Moscow: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Paradox Group LLC

how we implemented this floor design

FLOOR ARRANGEMENT FOR A FLOWER SHOP IN MOSCOW

According to the provided scheme, the height differences along the old base reached up to 40 mm, the base was quite old, unusable. Having agreed on the stages of the floor arrangement, we started work. And, as previously mentioned, the work should be completed the next day. The technology was used as standard with the use of guiding beacons and with polypropylene fiber and additional reinforcement with reinforcing mesh. Topping was applied mechanically at a rate of 3.5 kg per 1 m2.

RESULTS OF THE WORK

As a result of the work, the client received a smooth concrete floor with a hardener. The work was completed in just one working day. According to our forecasts, the coating will last at least twenty years.

The stages of the floor arrangement and the final result are shown in the photo below.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Preparation for the floor arrangement
2.jpg
Laying of polyethylene film
3.jpg
Binding of reinforcement mesh
4.jpg
Additional pipe protection
5.jpg
Delivery of the highway by a concrete pump
6.jpg
Installation of a concrete track
7.jpg
Acceptance of concrete mix
8.jpg
Completion of the reception of the concrete mixture

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Paradox Group LLC

SEE THE RESULT OF OUR WORK
result-paradoks.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton