INDUSTRIAL FLOOR FOR A WAREHOUSE IN ZARAYSK

WE HAVE SAVED FOR THE CLIENT 193 400
8%Economy
Floor for the warehouse of JSC "Zaraiskagropromsnab", Zaraysk

FLOOR ENGINEERING CONSTRUCTION Floor for the warehouse of JSC "Zaraiskagropromsnab", Zaraysk

140614, Moscow region, Zaraysk city, Mendyukino village, Agricultural Machinery str., 27
Characteristics and description
Company name
JSC "Zaraiskagropromsnab"
The purpose of the floor and the room itself
Floor for the warehouse of JSC "Zaraiskagropromsnab", Zaraysk
Type of floor
topping floors
Thickness of the concrete layer
100 cm
Room area
1910 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

DESCRIPTION OF THE OBJECT AND THE CLIENT'S NEEDS

The facility consisted of two industrial warehouses with an area of 955 m2. The premises were located far enough away from the concrete plant – a 40-minute drive to the facility. In order to receive the concrete mixture smoothly, we had to carefully monitor the person responsible at the concrete node. The base of the floor consisted of an old concrete screed, which crumbled in places. The differences reached up to 70 mm . The client needed a flat, dust-free concrete floor.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 14
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 12
Total cost
Budget within the framework of: 2 400 000 ₽
Floor for the warehouse of JSC "Zaraiskagropromsnab", Zaraysk: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: JSC "Zaraiskagropromsnab"

how we implemented this floor design

INSTALLATION OF A FLOOR FOR A WAREHOUSE IN ZARAYSK

The work was carried out in the warm season, which contributed to the rapid solidification of the concrete mixture. For this project, we applied the technology with the use of metal fiber of the Belgian concern "Beckart". In the case of this object, the option with the use of steel fiber was the most optimal, since it satisfied all the needs of the client. The old and crooked base was covered with sandy soil in order to bring the floor height to the marks specified by the client. The customer also indicated a slope towards the gate along the entire length up to 200 mm. Within two weeks, we completed work on two warehouses

THE RESULT OF OUR WORK

All the works and wishes of the client were fulfilled. Two warehouses were delivered on time and with high-quality concrete coating.

The stages of the floor arrangement and the final result are shown in the photo below.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Grout topping with two-rotor grout machines
2.jpg
Completion of the floor installation

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY JSC "Zaraiskagropromsnab"

SEE THE RESULT OF OUR WORK
result-zaraysk.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton