Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

INDUSTRIAL FLOOR FOR A WAREHOUSE IN MOSCOW

WE HAVE SAVED FOR THE CLIENT 37 700
2%Economy
Floor for the warehouse of LLC "Central Office", Moscow

FLOOR ENGINEERING CONSTRUCTION Floor for the warehouse of LLC "Central Office", Moscow

Moscow, Malomoskovskaya str., 22, p. 11
Characteristics and description
Company name
Central Office LLC
The purpose of the floor and the room itself
Floor for the warehouse of LLC "Central Office", Moscow
Type of floor
topping floors
Thickness of the concrete layer
100 cm
Room area
1718 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

FOUND OUT THE NEEDS OF THE CLIENT

In this case, the object on which concrete floors with a hardener were to be poured consisted of two rooms. The customer's need can be expressed in three words – reliable, high-quality, durable.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 60
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 20
Total cost
Budget within the framework of: 1 877 000 ₽
Floor for the warehouse of LLC "Central Office", Moscow: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Central Office LLC

how we implemented this floor design

DIFFICULTIES DURING WORK

At this facility, the main difficulty was the process of feeding the concrete mixture into the room. The concrete pump hose was fed through the window – it was impossible to start an arrow here. Therefore, a pipe track was collected from the hose.

THE RESULTS OF OUR WORK

The team of workers completed all the stages on time and at the proper level. The customer was satisfied with the result of the work. We look forward to further cooperation with him.

The stages of the floor arrangement and the result of the work are shown in the photo below.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
We prepare the concrete pump for the supply of concrete mix
2.jpg
Equipped a path for concrete through the window
3.jpg
Laid the track for the concrete mix
4.jpg
Laid the track in the corridor
5.jpg
We accept a concrete mixture
6.jpg
We accept and level the concrete
7.jpg
The concrete mixture was completely accepted and leveled
8.jpg
We treat the surface with a grout machine

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Central Office LLC

SEE THE RESULT OF OUR WORK
result-centralniy-ofis.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton