Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR IN A WAREHOUSE IN SHCHELKOVO

WE HAVE SAVED FOR THE CLIENT 248 800
20%Economy
Floor for the warehouse of LLC "Plastprofil", MO, Shchelkovo

FLOOR ENGINEERING CONSTRUCTION Floor for the warehouse of LLC "Plastprofil", MO, Shchelkovo

MO, Shchelkovo, Zavodskaya str., 2
Characteristics and description
Company name
Plastprofil LLC
The purpose of the floor and the room itself
Floor for the warehouse of LLC "Plastprofil", MO, Shchelkovo
Type of floor
topping floors
Thickness of the concrete layer
100 cm
Room area
888 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

FOUND OUT THE NEEDS OF THE CLIENT

The client set a task – to equip a concrete floor with a hardener on the 2nd floor of an industrial building. The space in which the work was required consisted of two rooms - a large room and a corridor.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 60
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 20
Total cost
Budget within the framework of: 1 244 000 ₽
Floor for the warehouse of LLC "Plastprofil", MO, Shchelkovo: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Plastprofil LLC

how we implemented this floor design

DIFFICULTIES DURING WORK

There was only one exit in the large room – it was, accordingly, the entrance to this room. Therefore, in order to get the workers inside and start processing, putting the material there, the workers performed the following procedure: first they filled half of the room from the gate to the far point, then turned around and filled the letter "P" with the second half from the far point to the exit – to the gate.

THE RESULTS OF OUR WORK

For two fills, the floor was made first in the room, and then in the corridor. The client had no complaints about the finished object. Due to the completion of work at this warehouse, the number of completed objects by PROFTEHPOL increased to 5. And we are determined to continue and continue further.

The stages of the floor arrangement and the result of the work are shown in the photo below.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
We are preparing the concrete pump to feed the concrete mixture
2.jpg
Installed a route for the supply of concrete
3.jpg
Concrete is being received
4.jpg
The concrete was accepted and leveled
5.jpg
A smooth concrete layer dries up
6.jpg
We process the floor with grout machines

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Plastprofil LLC

SEE THE RESULT OF OUR WORK
result-plastprofil.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton