Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

INDUSTRIAL FLOOR FOR A WAREHOUSE IN YEGORYEVSK

WE HAVE SAVED FOR THE CLIENT 246 783
26%Economy
Floor for the warehouse of LLC "Positive", MO, Yegoryevsk

FLOOR ENGINEERING CONSTRUCTION Floor for the warehouse of LLC "Positive", MO, Yegoryevsk

MO, Yegoryevsk, Smychka str., 52
Characteristics and description
Company name
LLC "Positive"
The purpose of the floor and the room itself
Floor for the warehouse of LLC "Positive", MO, Yegoryevsk
Type of floor
topping floors
Thickness of the concrete layer
90 cm
Room area
900 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

IDENTIFIED THE MAIN NEEDS OF THE CLIENT

The client briefly expressed the basic needs: low budget; dust-free coating; attractive appearance; resistance to erasure. After carrying out a technical assessment of this object, we chose a classic solution in such a situation – a concrete coating with topping, reinforced with macrofibre inside the room, and a reinforcing mesh outside.

The following aspects were important to the customer:

Terms of work
Number of days for all work: 15
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 950 000 ₽
Floor for the warehouse of LLC "Positive", MO, Yegoryevsk: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "Positive"

how we implemented this floor design

DIFFICULTIES IN THE INSTALLATION OF THE FLOOR AT THIS FACILITY

Of the difficulties, it is possible to note the unevenness of the coating (floor height differences of 3-5 cm). It was also necessary to carry out work both during the day and at night in order to be on time.

THE RESULTS OF OUR WORK

According to the results of the work performed, the customer had only positive impressions. Moreover, we received a letter of thanks from the head of warehouse and transport logistics.

See below the photos of the stages of the production cycle.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The object before the start of work
2.jpg
Preparation of the entrance for the entrance of the concrete pump
3.jpg
Dismantling of the old coating
4.jpg
We lay the waterproofing and install the guides
5.jpg
Laying of reinforcement mesh on the ramp
6.jpg
Acceptance of concrete mix
7.jpg
We level the concrete mixture
8.jpg
Leveling the floor surface with a rule
9.jpg
Installing the formwork for the ramp
10.jpg
Pour concrete on the ramp
11.jpg
Grout topping and check with a control rail
12.jpg
The process of grouting the floor indoors has been completed
13.jpg
Shrinkage seams are cut inside the room
14.jpg
We cut the shrinkage seams on the ramp

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY LLC "Positive"

SEE THE RESULT OF OUR WORK
result-egorevsk-sklad.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton