Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

INDUSTRIAL FLOOR FOR A WAREHOUSE IN MYTISHCHI

WE HAVE SAVED FOR THE CLIENT 327 421
20%Economy
Floor for the warehouse of LLC "Projectstroymontazh", Mytishchi

FLOOR ENGINEERING CONSTRUCTION Floor for the warehouse of LLC "Projectstroymontazh", Mytishchi

MO, Mytishchi, Kolpakov str., 20
Characteristics and description
Company name
LLC "Projectstroymontazh"
The purpose of the floor and the room itself
Floor for the warehouse of LLC "Projectstroymontazh", Mytishchi
Type of floor
topping floors
Thickness of the concrete layer
160 cm
Room area
492.5 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

IDENTIFIED THE MAIN NEEDS OF THE CLIENT

When identifying the needs of the client, the following task was set: we need a smooth, durable, clean, concrete floor for the warehouse. Six-meter racks will be installed at this facility. The planned load on the rack is six tons. We chose the technology of concrete topping floor with preliminary removal of soil.

The following aspects were important to the customer:

Terms of work
Number of days for all work: 30
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 1 650 000 ₽
Floor for the warehouse of LLC "Projectstroymontazh", Mytishchi: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "Projectstroymontazh"

how we implemented this floor design

DIFFICULTIES IN THE INSTALLATION OF THE FLOOR AT THIS FACILITY

The floor was heterogeneous, so the filling was carried out in two stages. The work was carried out at subzero temperatures, which became the main difficulty. At the solidification stage, a number of measures were taken to increase the temperature inside the room; the ramp was insulated; a heat gun was installed.

THE RESULTS OF OUR WORK

The client received a high-quality concrete coating that meets construction standards. Due to the use of microfiber instead of reinforcing mesh in most of the warehouse (except for the entrance), we were able to save 327,421 rubles.

See below the photos of the stages of our work.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The condition of the floor before the start of work
2.jpg
Prepared the foundation
3.jpg
We lay the waterproofing tape
4.jpg
Install the guides
5.jpg
We have prepared the necessary materials
6.jpg
The concrete mix is being accepted
7.jpg
Pour the concrete mixture
8.jpg
We lay the reinforcement network at the entrance
9.jpg
The second stage of pouring concrete
10.jpg
Ramp insulation for solidification of poured concrete
11.jpg
Leveling of concrete
12.jpg
The grout process is underway
13.jpg
Solidification of concrete
14.jpg
The shrinkage seams were cut

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY LLC "Projectstroymontazh"

SEE THE RESULT OF OUR WORK
result-sklad-mytishchi.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton