Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

CONCRETE FLOOR FOR A WAREHOUSE IN MYTISHCHI

WE HAVE SAVED FOR THE CLIENT 115 200
20%Economy
Floor for the warehouse of Mytishchi RAIPO

FLOOR ENGINEERING CONSTRUCTION Floor for the warehouse of Mytishchi RAIPO

MO, Mytishchi, Silicate str., 11
Characteristics and description
Company name
Mytishchi District Consumer Society
The purpose of the floor and the room itself
Floor for the warehouse of Mytishchi RAIPO
Type of floor
topping floors
Thickness of the concrete layer
90 cm
Room area
394 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

FOUND OUT THE NEEDS OF THE CLIENT

The customer voiced his wish simply – to fill the concrete floor with topping in the warehouse and basement. For our company with more than 11 years of experience in the field of floors, such a task is quite possible. The chief engineer went to the facility, conducted a technical assessment of the premises and, returning to the office, compiled a detailed technical program. After signing the contract and immediately after the transfer of the work front, our guys started implementing the result conceived (by the client) and clearly planned (by our chief engineer).

The following aspects are important to the customer:

Terms of work
Number of days for all work: 30
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 20
Total cost
Budget within the framework of: 576 000 ₽
Floor for the warehouse of Mytishchi RAIPO: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Mytishchi District Consumer Society

how we implemented this floor design

DIFFICULTIES DURING WORK

To fill the floor in the basement, we had to make a hole in the wall. The workers laid a concrete track through this hole – there was no other way to deliver the concrete mixture there.

THE RESULTS OF OUR WORK

The floors were filled in on time and efficiently. The client is satisfied with the result, so are we. And we are also pleased that we have already equipped the floors for the fourth object in the city of Mytishchi.

The stages of the floor arrangement and the result of the work are shown in the photo below.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
We accept a concrete mix for the basement
2.jpg
We accept and level concrete in the warehouse
3.jpg
We level and seal the concrete layer
4.jpg
Applied and rubbed the reinforcing layer
5.jpg
Applied a lacquer layer to the floor surface
6.jpg
We cut the shrinkage seams

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Mytishchi District Consumer Society

SEE THE RESULT OF OUR WORK
result-mytishchi-raipo.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton