Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

INDUSTRIAL FLOOR FOR A WAREHOUSE IN ISTRA

WE HAVE SAVED FOR THE CLIENT 283 667

FLOOR ENGINEERING CONSTRUCTION Floor for the warehouse-store of EXPO-SERVICE LLC, MO, Istra

MO, G.O. Istra, P. Severny, p. 41
Characteristics and description
Company name
EXPO-SERVICE LLC
The purpose of the floor and the room itself
Floor for the warehouse-store of EXPO-SERVICE LLC, MO, Istra
Type of floor
topping floors
Thickness of the concrete layer
150 cm
Room area
865 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

IDENTIFIED THE NEEDS OF THE CLIENT

In December 2019, Alexey Sergeevich turned to us with a request: "We are interested in topping floors, high-quality and inexpensive coating." The premises are located in the Moscow region – Istra district. Warehouse loads are planned at the facility with an area of 864.7 m2, electric cars will drive. We chose a technology – a concrete floor with a reinforced top layer, reinforced with fiber.

The customer planned to repair the floors by the end of the year – at the time of the request, construction work was still underway at the facility. At the end of April, we signed a contract and started work.

The following aspects were important to the customer:

Terms of work
Number of days for all work: 30
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 1 420 000 ₽
Floor for the warehouse-store of EXPO-SERVICE LLC, MO, Istra: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: EXPO-SERVICE LLC

how we implemented this floor design

DIFFICULTIES DURING WORK

Height differences of up to 30 cm are the only difficulty of this object. It was eliminated by removing part of the asphalt on one side, where the surface is higher, and filling and tamping sand on the other side, where the surface is lower.

See below the photos of the stages of our work.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Preparing the floor for the foundation
2.jpg
The concrete pump is ready to feed
3.jpg
We lay the waterproofing film
4.jpg
We are conducting the route
5.jpg
We are conducting the route
6.jpg
Mix the fiber with concrete
7.jpg
We accept and level the concrete mixture
8.jpg
Completed the fill
9.jpg
We level the applied topping with a control rail
10.jpg
We treat the surface with grout machines
11.jpg
Sealing the seams
12.jpg
Sealing of shrinkage joints has been completed

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY EXPO-SERVICE LLC

SEE THE RESULT OF OUR WORK
result-expo-servis.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton