INDUSTRIAL CONCRETE FLOOR IN A WAREHOUSE IN THE SHCHELKOVSKY DISTRICT OF THE MOSCOW REGION

WE HAVE SAVED FOR THE CLIENT 889 800
20%Economy
Industrial concrete floor in a warehouse in the Shchelkovsky district of the Moscow region

FLOOR ENGINEERING CONSTRUCTION Industrial concrete floor in a warehouse in the Shchelkovsky district of the Moscow region

MO, Shchelkovsky district, Bogoslovo village, ter. Selskohozyajstvennaya, 8
Characteristics and description
Company name
Asanta LLC
The purpose of the floor and the room itself
Industrial concrete floor in a warehouse in the Shchelkovsky district of the Moscow region
Type of floor
topping floors
Thickness of the concrete layer
18 cm
Room area
1188 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

A customer approached us with the task of making an industrial floor at an object in the Shchelkovsky city district. His intention was to lease this warehouse after all the work.

Since the future production loads were unknown at the time of the negotiations, the client asked to "calculate to the maximum." The technical solution was chosen as follows – a concrete floor of an average thickness of 18 cm with a hardener and reinforcement with steel fiber.

Terms of work
Number of days for all work: 7
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 4 499 100 ₽
Industrial concrete floor in a warehouse in the Shchelkovsky district of the Moscow region: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Asanta LLC

how we implemented this floor design

FEATURES OF THE WORK

The customer prepared the sandy base himself. After completing this stage, a specialist went to check on us, and strong fluctuations were found. If they had left everything as it is and began to prepare the base for pouring, the client would have had to pay about 600,000 rubles more for concrete.

Therefore, we postponed the already planned filling and waited for the customer to bring the base into a more or less suitable condition. As a result, the overspending of concrete during pouring still happened, but not as much as it could have.

In front of the gate, the client decided to further strengthen a small area with a reinforcement cage. We did not interfere in any way, because this does not contradict the standard technology.

The average thickness of the concrete was 18 cm. When cutting seams, a large seam cutter was used to ensure the desired depth. After the work, there was a lot of dust and dirt on the floor. The client asked to settle this point, so a worker came from us again and cleaned the territory.

OUR RESULTS

The entire production cycle went quite smoothly. We are satisfied with the results of the work, and so is the customer. We wish him to find a good tenant as soon as possible!

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The customer is completing the preparation of the foundation
2.jpg
Installed a corner at the entrance gate
3.jpg
The film is covered and taped
4.jpg
The equipment has been delivered to the facility
5.jpg
The pouring process
6.jpg
Leveling of concrete with a laser level
7.jpg
In parallel with the filling, we make a grout on the already hardened area
8.jpg
After grout, varnish has been applied
9.jpg
We are cutting the seams with a depth of 6.5 cm
10.jpg
Checking the depth of the seams
11.jpg
Dust and dirt were removed after cutting the seams
12.jpg
Sealing of seams has been completed

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Asanta LLC

SEE THE RESULT OF OUR WORK
result-asanta-mo-schelkovskij-rajon.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton