WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
The customer had previously ordered work on the installation of concrete floors from another contractor. But at that time it turned out that they had brought bad concrete. It was necessary to completely dismantle the made coating.
The customer contacted us after the incident so that everything was done clearly this time. It was necessary to fill the floor on the ramp and ramp, as well as on a separate area of 120 m2.
The technical solution was chosen as follows – a concrete floor with a reinforcing top layer with an average thickness of 210 mm, reinforced with a double layer of reinforcement frame.