WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
The customer warned from the very beginning that the room belongs to the third class of danger, in connection with which electricity should not accumulate and there should be no sparking. The loads in the room were planned to be large – by 10-20 tons. In addition to the floor in the room itself, a ramp was also required.
Taking into account all the nuances of the object, we chose the most suitable technical solution – a concrete floor with topping reinforced with steel fiber, and topping of a different type (not the same as usual).
The following aspects are important to the customer: