IDENTIFIED THE MAIN NEEDS OF THE CLIENT
The client was building a logistics center with an area of 200,000 m2. and I was looking for those who are able to perform seamless tiles and guarantee the absence of cracks in the future. At the time of contacting Proftehpol, the previous contractor had already made 40,000 m2 of floors that had cracked for several months. Therefore, the customer made a choice in favor of our company. The task was as follows: to perform a steel–fiber concrete floor with a hardener without cutting shrinkage seams – the so-called seamless floor - with a requirement for evenness of 1 mm per 1 meter; to fill and topping an area of 1,500 m2 daily.
The following aspects were important to the customer: