CONCRETE FLOOR WITH TOPPING FOR A CONCRETE NODE NEAR THE CITY OF VIDNOYE

WE HAVE SAVED FOR THE CLIENT 324 700

FLOOR ENGINEERING CONSTRUCTION Industrial floor with topping for a concrete node near the city of Vidnoye

Moscow region, Vidnoye, Aparinki village, possession 10
Characteristics and description
Company name
Platon-Stroy
The purpose of the floor and the room itself
Industrial floor with topping for a concrete node near the city of Vidnoye
Type of floor
topping floors
Thickness of the concrete layer
120 cm
Room area
860 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

Our customer in this case was a concrete unit. Usually we ourselves are a client for such enterprises, but here it turned out the opposite – they ordered work from us on the installation of an industrial floor.

In an open area – without walls and a roof – it was necessary to make a concrete floor. Its total area was about 1,600 m2, but we got only 860 m2. It turned out so for this reason: initially, the customer applied for the service to another company, which flooded half of the area, but without topping. And by this time the client found out about topping and therefore invited us already.

In addition to strengthening and prolonging the service life of the properties of topping, it was important for the customer to have it from a technical point of view. Concrete slabs will be manufactured for sale on the finished site. During their production, if concrete gets on the coating without topping, it will be necessary to lay the film every time, otherwise the trapped concrete will stick strongly to the floor. In the case of topping, the degree of adhesion will be lower.

The technical solution was chosen as follows – concrete floor with topping with an average thickness of 12 mm; combined reinforcement – reinforcement in one layer and polypropylene macrofibre.

Terms of work
Number of days for all work: 6
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 1 623 700 ₽
Industrial floor with topping for a concrete node near the city of Vidnoye: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Platon-Stroy

how we implemented this floor design

FEATURES OF THE WORKS

Even before pouring, the base was prepared by the customer, which was not a single large concrete slab, but several small tiles. In some places, they lay unsteadily; they staggered when equipment moved over them. We asked the customer to settle this point. But, to be honest, they did not double-check themselves before the work.

As a result, cracks with a thickness of 1 mm were formed in two places. After discussing with the client, we decided that it was even better not to embroider or seal them, since they were too thin.

Also, during the grout of the topping, several square meters of the platform with dimples were found. This happened because at the stage of grout topping, the workers entered the concrete platform a little earlier than the right time.

For both defects (two cracks and several places with dimples), the customer and I came to this decision: we provide an adequate discount for him; he, in turn, operates the floor to the full within a month and checks its strength. If the floor meets the stated requirements, then we sign all the documents with the client and thereby complete this cycle of work.

OUR RESULTS

As mentioned above, the work at this facility did not go quite smoothly. Nevertheless, the client received a topping floor at his disposal, which turned out to be quite serviceable and has already managed to show itself on the good side directly "in battle".

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
The customer is preparing the site for our work
2.jpg
The waterproofing film is laid; the reinforcement is being knitted
3.jpg
The customer has cleared the entrance to the facility for the pump and mixers
4.jpg
Checking the armature pitch
5.jpg
Granite crushed stone for concrete
6.jpg
The pump is in place
7.jpg
Laying the route
8.jpg
We are accepting a concrete mixture
9.jpg
Concrete was leveled and compacted on part of the square
10.jpg
Concrete compaction with a vibrating rack
11.jpg
The work of grout machines with disks has begun
12.jpg
Applying topping
13.jpg
Seams are cut
14.jpg
The seams were sealed with a herringbone

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Platon-Stroy

SEE THE RESULT OF OUR WORK
result-ploschadka-betonniy-usel-aparinki.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton