Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

POLYMER FLOOR IN ODINTSOVO CITY DISTRICT

WE HAVE SAVED FOR THE CLIENT 345 400
15%Economy
Self-leveling self-leveling epoxy coating for industrial and warehouse premises in the village of Bolshye Vyazemy

FLOOR ENGINEERING CONSTRUCTION Self-leveling self-leveling epoxy coating for industrial and warehouse premises in the village of Bolshye Vyazemy

MO, Odintsovo G.O., rab. pos. Bolshye Vyazemy, 39
Characteristics and description
Company name
LLC Scientific and Production Company "YUMAS"
The purpose of the floor and the room itself
Self-leveling self-leveling epoxy coating for industrial and warehouse premises in the village of Bolshye Vyazemy
Type of floor
polymer floors
Thickness of the polymer coating
2 mm
Room area
487 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

We have already worked with this customer before – we made a concrete screed on the ground floor, and a topping floor on the basement. And now there is a need for a polymer coating. For the client, 2 factors of the final gender were important: anti-dust and aesthetics.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 12
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 2 303 000 ₽
Self-leveling self-leveling epoxy coating for industrial and warehouse premises in the village of Bolshye Vyazemy: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC Scientific and Production Company "YUMAS"

how we implemented this floor design

FEATURES OF THE WORKS

Before starting work on the polymer coating, we had to repair the concrete screed for the following reason. When the elevator arrived on the first floor, it stopped 3 cm below the floor. We carefully dismantled part of the concrete screed so that it smoothly and imperceptibly descended to the elevator by these 3 cm. It turned out to be a small barely noticeable ramp at a distance of 2 m.

The customer needed aesthetics. At the moment when the color was already agreed and the work was about to begin, he suddenly wished that the coating was with flocks. The customer specified how the issue could be resolved quickly. As a result, the situation was solved as follows: several samples of flocks were brought to the facility; they were scattered on the concrete pavement so that the customer could see how it would look; he chose the option he liked and determined the concentration of flocks per unit area; they quickly issued and signed an additional agreement.

OUR RESULTS

All the wishes of the customer were taken into account, the work was completed on time. Now the client has another reliable coating, which is also beautiful.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Dismantled the area near the elevator
2.jpg
Repairs have been carried out
3.jpg
Drying of the base
4.jpg
Delivered materials
5.jpg
Started work
6.jpg
Grinding
7.jpg
Primer
8.jpg
The seams are filled. The first layer of soil is applied
9.jpg
The priming stage continues
10.jpg
Coating before development
11.jpg
The development has been completed
12.jpg
Arranged the main layer

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY LLC Scientific and Production Company "YUMAS"

SEE THE RESULT OF OUR WORK
result-yumas.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton