On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

TOPPING INDUSTRIAL FLOOR FOR A CAR SERVICE IN MOSCOW

WE HAVE SAVED FOR THE CLIENT 163 900

FLOOR ENGINEERING CONSTRUCTION Topping floor for a car service in Moscow on the Leningrad highway

Moscow, Leningradskoe sh., 63g
Characteristics and description
Company name
LLC "Production Construction Company"
The purpose of the floor and the room itself
Topping floor for a car service in Moscow on the Leningrad highway
Type of floor
topping floors
Thickness of the concrete layer
180 cm
Room area
126.24 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION

At the car service station with an area of 126.24 m2, it was necessary to make a new coating. The current base was concrete with an average drop of 2 cm, and in some places 5 cm. A classic technical solution was chosen – a concrete floor with topping reinforced with macrofibre.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 20
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 819 800 ₽
Topping floor for a car service in Moscow on the Leningrad highway: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "Production Construction Company"

how we implemented this floor design

FEATURES OF THE WORKS

The work at the facility was carried out without difficulties. As a bonus, we installed corners in front of the gate, and also framed two pits in the middle of the room to strengthen the edge of the concrete.

OUR RESULTS

The customer received a durable concrete coating with a hardener, which can now be used in full for production purposes.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Materials have been delivered
2.jpg
We prepared frames from corners with "moustache" fittings for pits
3.jpg
The installation of the formwork for the pit gates has been completed
4.jpg
Have you finished the preparation
5.jpg
Installed the route
6.jpg
Equipment on site
7.jpg
The filling has started
8.jpg
After the grout is completed, we apply the varnish
9.jpg
Before cutting seams
10.jpg
We cut the seams

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY LLC "Production Construction Company"

SEE THE RESULT OF OUR WORK
result-psk.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton