WE HAVE SELECTED THE OPTIMAL ENGINEERING SOLUTION
At this facility, the task was to make a floor for a building that did not exist yet. The customer planned to build a prefabricated warehouse on our already finished floor by another contractor. Therefore, the scope of work included preparing a base of sand and filling the floor even in street conditions.
A standard technical solution was chosen – a concrete floor with topping. But the thickness was already required seriously – 200 mm – for the reason described above. According to the project, 2 layers of reinforcement were to be connected, and additional reinforcement was required along the perimeter, where the largest load from the building falls.