WE HAVE CHOSEN THE OPTIMAL ENGINEERING SOLUTION
The current old, uneven, ruined foundation of the floor was as follows: a sand cushion, concrete covering and reinforcement with a wide pitch of about half a meter. And the existing foundation had a very large height difference. It was necessary to perform a new floor and at the same time repeat the contour. We have proposed a standard technical solution – a leveling concrete screed with a hardener in the form of macrofibre.
The following aspects are important to the customer: