Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

INDUSTRIAL FLOOR IN A WAREHOUSE IN KIRZHACH

WE HAVE SAVED FOR THE CLIENT 179 600
20%Economy
Concrete floor with reinforcing top layer for Russtekloplast LLC warehouse

FLOOR ENGINEERING CONSTRUCTION Concrete floor with reinforcing top layer for Russtekloplast LLC warehouse

Vladimir region, Kirzhach, mkrn Krasny Oktyabr, Pervomayskaya str., 1D
Characteristics and description
Company name
Russtekloplast LLC
The purpose of the floor and the room itself
Concrete floor with reinforcing top layer for Russtekloplast LLC warehouse
Type of floor
topping floors
Thickness of the concrete layer
160 cm
Room area
300 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

FOUND OUT THE NEEDS OF THE CLIENT

The owner of the warehouse in Kirzhach expanded production. Before that, the object acted as a utility room. The client wanted to fill the concrete floor with topping and install machines in it.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 30
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 20
Total cost
Budget within the framework of: 898 000 ₽
Concrete floor with reinforcing top layer for Russtekloplast LLC warehouse: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: Russtekloplast LLC

how we implemented this floor design

DIFFICULTIES DURING WORK

On the site where we worked, there were three machine beds. Concrete had to be poured around them as well. Moreover, there were metal frames in the frames themselves – it was necessary to fill them here and sand them as well as possible. All these nuances are quite a big problem.

It is also worth paying attention to another difficulty: due to the peculiarities of the premises, it was necessary to build a very long concrete pump track.

OUR RESULTS

The client was very satisfied with the result of the work. Our workers did a good job, especially in the field of metal frames – they were manually filled in, covered up with "ironers". The result – it turned out smoothly and beautifully. The client will continue to work with our company – we will fill in the second half.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
We begin receiving the concrete mixture
2.jpg
Application and grout of the reinforcing layer
3.jpg
Completed the grout process
4.jpg
A moisture-retaining impregnation was applied

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY Russtekloplast LLC

SEE THE RESULT OF OUR WORK
result-russtekloplast.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton