Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

INDUSTRIAL FLOOR AT A CAR WASH IN MOSCOW

WE HAVE SAVED FOR THE CLIENT 258 800
20%Economy
Topping floor for car wash in Moscow in Lefortovo

FLOOR ENGINEERING CONSTRUCTION Topping floor for car wash in Moscow in Lefortovo

Moscow, Highway Enthusiasts, d. 3, k. 2
Characteristics and description
Company name
LLC "KOR12"
The purpose of the floor and the room itself
Topping floor for car wash in Moscow in Lefortovo
Type of floor
topping floors
Thickness of the concrete layer
110 cm
Room area
315 m²

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE DETERMINED THE OPTIMAL ENGINEERING SOLUTION

In this case, it was necessary to fill the floors at a car wash in the Lefortovsky district of Moscow. The customer indicated in the preliminary technical assessment that it is necessary to make a "decoupling" so that the water flow goes to the pits. He also specified the requirements for the final coating as resistance to moisture, dust, abrasion and the ability to withstand dynamic loads from passenger cars weighing up to 3.5 tons. Our technical solution is a concrete and macrofibre floor with topping.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 30
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 5
Total cost
Budget within the framework of: 1 294 000 ₽
Topping floor for car wash in Moscow in Lefortovo: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "KOR12"

how we implemented this floor design

DIFFICULTIES DURING WORK

The main difficulty was that it was an object under a new house, where cars were constantly driving. We had to build a platform through the pipe of the concrete pump, along which they all moved back and forth. Our workers helped the drivers to drive on it correctly so that they would not move out.

OUR RESULTS

The work was completed on time in compliance with all technical requirements. The customer was satisfied.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Waterproofing of the abutment has been performed
2.jpg
Installing guides
3.jpg
Preparation of the bridge for the concrete pump route and the possibility of passage for cars
4.jpg
We accept a concrete mixture
5.jpg
Installed bridges through the concrete pipeline
6.jpg
Completed the filling stage
7.jpg
The floor surface is covered with a layer of varnish
8.jpg
Shrinkage seams are cut

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY LLC "KOR12"

SEE THE RESULT OF OUR WORK
result-core-12.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton