WE HAVE CHOSEN THE OPTIMAL ENGINEERING SOLUTION
The building is some kind of old agricultural facility (most likely, either a storage facility or a primary processing workshop). The customer needed to align the base for the room with the equipment. He has a confectionery shop – the production of oriental sweets. And it was also necessary to make two ramps – a check-in and an exit. An important condition is that the customer wanted a technical solution that would require minimal costs to implement.
We proposed a concrete floor with a reinforcing top layer, reinforced with mesh on the ramps, and macrofibre in the room itself. This option suited the client, so they stopped at it.
The following aspects are important to the customer: