Our engineering in action
On the example of the floor arrangement for the largest transport and logistics center of Belarus "Prilesye"

INDUSTRIAL FLOOR FOR TEA PRODUCTION IN NOGINSK

WE HAVE SAVED FOR THE CLIENT 468 300

FLOOR ENGINEERING CONSTRUCTION Topping floor for industrial and warehouse premises in Noginsk

MO, Noginsk, Industrialnaya str., 40
Characteristics and description
Company name
LLC "C.K. ELEPHANT"
The purpose of the floor and the room itself
Topping floor for industrial and warehouse premises in Noginsk
Type of floor
topping floors
Thickness of the concrete layer
90 cm
Room area
1000 sq. m.

Customer needs AND THE OPTIMAL ENGINEERING SOLUTION

factors taken into account when developing the floor design

WE HAVE CHOSEN THE OPTIMAL ENGINEERING SOLUTION

Initially, the customer had an idea to make a polymer floor in his production and warehouse. The task was to bring the base into a more or less even appearance and make the final coating powerless.

After examining the base, we suggested another solution, because it would be more expensive to align with polymer. In addition to the financial aspect, there were others. There were local fractures at the base – dimples. Another argument against a technical solution using a polymer coating is a shorter service life. Therefore, we offered the customer a concrete floor with topping. This option turned out to be advantageous both in terms of price and durability.

The following aspects are important to the customer:

Terms of work
Number of days for all work: 20
Requirements for the quality of work
Floors must comply with SNiP 2.03. 13-88
Appearance of floors
Must look presentable
Durability
Service life of floors without repair (years): 10
Total cost
Budget within the framework of: 2 341 500 ₽
Topping floor for industrial and warehouse premises in Noginsk: The object before the start of work
The object before the start of work

Floor arrangement ACCORDING TO THE ENGINEERING SOLUTION FOR THE OBJECT: LLC "C.K. ELEPHANT"

how we implemented this floor design

FEATURES OF THE WORKS

The room was on the second floor. Concrete had to be fed through a small window. This stage required special care not to damage the window. In the room itself, there was another obstacle in the form of a wall consisting of a profiled sheet in the way of concrete supply. The solution was simple – unscrewed the screws and removed it for a while.

Another feature of the work is the stage when we dismantled a concrete screed under the ramp. Concrete from the second floor was taken out through a freight elevator.

OUR RESULTS

At one of the final stages of the work, the client, having seen the floor, left this review:

"I looked at the floor yesterday. He's wonderful. If nothing cracks there and everything is fine, then this is one of the best floors I've ever seen. I hope that everything will end well there. It turned out very cool!"

As you can see from the final photos, everything worked out and nothing cracked.

Stages of implementation engineering design of the floor

engineering design of the floor
1.jpg
Preparation of the foundation
2.jpg
Dismantling of ramp sections
3.jpg
They threw out all the garbage
4.jpg
A concrete pump is approaching
5.jpg
Preparation for the supply of concrete mix
6.jpg
Beacons are installed
7.jpg
The stage with the reception and leveling of the concrete mixture
8.jpg
Leveled concrete on one of the sites
9.jpg
The process of cutting shrinkage seams
10.jpg
Applying topping
11.jpg
Grout of the surface by grout machines
12.jpg
Completed the grout
13.jpg
Applied varnish
14.jpg
Preliminary marking for cutting seams
15.jpg
We cut the shrinkage seams
16.jpg
The seam cutting stage has been completed

The result of floor engineeringDELIVERED ON TIME, STANDARD, TECHNOLOGICAL INDUSTRIAL FLOORS AT THE FACILITY LLC "C.K. ELEPHANT"

SEE THE RESULT OF OUR WORK
result-chk-slon.jpg

READ REVIEWS OUR SATISFIED CUSTOMERS

Reviews that we managed to collect between production cycles at our facilities

ReviewsABOUT THE PROFTEHPOL PROJECT

We are well aware that reviews of companies can be very different. Working in the construction market for more than 15 years, we have faced various situations.

We have both satisfied customers and those who are not. But, there is one important thing: we always bring the cycles of our provision to the end. If a client has problems, then we do not leave him with them, but settle them to a full and final conclusion.

Working with us, you can be sure that we will make you an industrial floor that is exactly right for the task for which you needed it.

Thanks to a good knowledge of the technology of industrial floors, we have gathered a lot of practical experience in using floor structures in various difficult places. We solve non-trivial problems and often, when we take an order, 3-4 companies have already tried to take it before us, but refused due to the complexity of the object.

Our clients Which we are proud of

for which we have made good floors
Legal informationSociety Limited Liability "PROFTECHENGINEERING" Shareholdt International consumer society "GOLDEN AXIS"TIN 9709064635CHECKPOINT 770901001OGRN 1207700295406Legal address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL company
POSTAL DETAILSActual address:109147, Moscow, B.Andronevskaya str., 23, building 1, floor 8, room 4, office of PROFTEHPOL companyPhone number for details:8 800 550 90 72E-mail:info@proftechpol.ru
Financial detailsCurrent account: 40702810870010234730MOSCOW BRANCH OF JSC CB "MODULBANK" MoscowBIC 044525092Correspondent account 30101810645250000092CEO of Nazyrov Anton