WE HAVE CHOSEN THE OPTIMAL ENGINEERING SOLUTION
The object is an industrial building of a former brick factory that was in operation. There was an old concrete covering in the room, which, according to the characteristics, no longer met modern requirements. The customer planned to open a new production facility in this workshop. To achieve this goal, one of the key factors is a modern concrete floor.
We have proposed our technical solution – a concrete leveling screed with a hardener reinforced with macrofibre. For the customer, this turned out to be the most suitable option, because "the engineering solution itself is very sensible" (his words), and everything was fine with the cost.
The following aspects are important to the customer: